You are here: Home / Services & Products / Commercial
Commercial
Unit 1, Dublin Airport Logistics Park, Co. Dublin
|
Architect: Val O'Brien & Associates Kercon were appointed as Main Contractor & PSCS for the Unit 1, DALP fitout. The project comprised of the fitout of the existing ground floor office space. This included the subdivision of the space with the installation of stud & glazed partitions, alterations & upgrades to the existing Mech & Elec service installations to suit the new client’s needs, access control, provision of floor & wall finishes & alterations to the existing ceilings. Works were also carried out to the main warehouse area, mainly Mechanical & Electrical installations, heating, lighting upgrades, new racking units and new floor markings. |
IFAC, Trim, Co. Meath
|
Architect: Declan Clabby & Associates Works involved the Construction and Fit-Out of a Single Storey Office Building.
|
Centra Shop & Apartments, Kilmessan, Co. Meath
|
Architect: Val O'Brien & Associates This project involved the construction of a 5000 sqft shop unit along with five 1 & 2 bed apartments. Kercon were contracted for the development of five 1 & 2 bed apartments, along with the construction of a 5000 sq.ft retail unit. This project involved the demolition of an existing building, excavation and disposal of material on site for re-use, substructure works, superstructure works to include 250mm Hollow-Core Floor Slabs. Fit out works included mechanical and electrical installations, kitchens, sanitaryware, painting and decorating etc. Kercon also completed all civil engineering works on site which included paved footpaths, precast concrete kerbs, all service installations, (Foul, Surface Water, ESB, Telecom), driveway construction, boundary walls and landscaping. |
Ma Dwyers Guesthouse, Navan, Co. Meath
|
Architect: Declan Clabby & Associates State of the art 28 bedroom guest-house, along with all laundry rooms, kitchens and dining rooms. |
Marlinstown Office Park, Mullingar, Co. Westmeath
|
Architect: ORS Consulting Engineers Construction of two 3-4 storey office blocks, 34000 sqft & 45000 sqft respectively, along with all associated site development works. |
Canteen Building, Boliden Tara Mines, Navan, Co. Meath
|
Architect: ORS Consulting Engineers
Construction of two 3-4 storey office blocks, 34000 sqft & 45000 sqft respectively, along with all associated site development works. |